Engineering case

——

Central Plaza Project
The structure adopts reticulated shell space structure system, and the cross-section of the rod member of the grid structure should be determined according to the strength and stability calculation.
Previous page
1

Prefabricated

 

 

Building

 

Materials

Cases

 

 

Steel Structure

 

Grid

 

Container

 

Municipal

Contact Us

 

 

Contact Us

 

Message

 

HR

 

Shandong Hongsanye Steel Structure Engineering

ADD: 30 meters north of the east of the West Ring Overpass, Junshan West Road, Shizhong District, Zaozhuang City, Shandong Province

公众号二维码

WeChat Official Accounts